TICKFAW—The long-awaited overlay of George Road is scheduled to begin this week as crews prepare the roadway with soil cement.

Tangipahoa Parish President Robby Miller said Phase 2023 crews will apply soil cement to George Road during the week of September 5.

The following Phase 2023 projects are also scheduled to begin this week:

  • Dressing: Hickory Drive, George Fisher Road, Cemetery Road, Pecan Allee, Pecan Trace Drive, Twin Lakes, Kellywood Boulevard, Snowball Circle Subdivision, Plum Street, Hollie, Loyd, and Miller Lane;
  • Milling: Oak Creek Trace, Weald Way, Ruby Oak Court, Holly Drive, Magnolia Banks;
  • Patching: Oak Creek Trace, Weald Way, Ruby Oak Court, Holly Drive, and Magnolia Banks.

All road work is scheduled as weather permits. Detours will be posted, as necessary, and Miller encourages motorists to use care when traveling through work zones.